Hipped roofs with bays off Belmont Rise
Belmont Rise did not exist until 1927. It was built as the Sutton bypass and, as the residents' association history puts it, it cut through the Belmont Estate. Through the 1920s and 1930s new housing filled the land between Belmont and Sutton, and the road now carries the A217.
The houses from that period, on and off the Rise and on the roads that filled in towards Sutton, are built differently from the Victorian terraces near the station. They tend to be semis and detached houses with hipped roofs, bay windows with their own small roofs, and long runs of eaves. Roofs of that era were commonly tiled in clay or concrete straight onto battens, with little or no felt underneath.
A hipped roof has more cutting than a simple gable. Every hip needs tiles cut to the line and a run of hip tiles bedded or fixed over it, and each bay and porch roof is a small roof of its own with its own lead against the wall. That is why Checkatrade's published guide, which gives a UK average of around £8,000 with most jobs between £4,000 and £19,000, is only a starting point for a house like this: hipped roofs with bays tend to sit higher in that range.
What goes back on, and what gets saved
The first decision is the covering. If the house was tiled in clay and some tiles are sound, they can sometimes be reused on a less visible slope, with new tiles made up elsewhere. If it was re-covered in concrete at some point, the rafters have already carried that weight, and the choice between concrete, clay and slate comes down to looks, cost and what the timbers can take. We go through the options with photos of your own roof.
The second is what else to do while the scaffold is up. Bay and porch roofs are the same age as the main roof, and leaving them means a second scaffold later for a small roof that is often the first to leak. It is also the obvious time to renew the fascias and soffits and gutters.
When we strip, the old tiles, battens and felt come off down to the rafters, any rot is cut out and replaced, and the roof goes back with a breathable membrane, new battens and the new covering, hips, ridges and leadwork. If you are not yet sure it has reached that point, our Belmont roof repair page covers the faults that can still be fixed, and the signs of a spent roof are on our main roof replacement page.

Scaffolding beside the A217
For a house that fronts Belmont Rise, the scaffold is the part that needs most planning. A scaffold that stands on the public footway needs a licence from the highway authority, and the design has to keep pedestrians safe on a busy main road. We build the time for that into the programme and tell you at the quote stage what it involves.
Skips and material deliveries need the same thought. Where a house has a front drive, they can usually go there. Where it does not, deliveries are planned to keep the footway clear.
Changing the shape or covering: Sutton's 1984 direction
A like-for-like re-roof on an ordinary house is normally maintenance and needs no planning permission, though it does have to meet Building Regulations. Sutton has one extra thing to check. The council's Article 4 directions page lists a 1984 direction that removed the right to alter roofs on a number of individual properties across the borough. It is not drawn around Belmont as an area, so if you want to change the covering or the shape of the roof, ask the council whether your address is affected before you order materials. Listed buildings, such as Sutton Lodge on Brighton Road, are a separate matter: re-covering one normally needs listed building consent.
Frequently asked questions
Our house on Belmont Rise faces the A217. Can the scaffold go on the pavement?
Yes, once the highway authority has granted a licence for it. That has to be in place before the scaffold goes up, so we explain the timing when we quote. The scaffold is designed to keep a safe route for people walking past.
Our 1930s house off Belmont Rise has no felt under the tiles. Does a re-roof have to add it?
A new roof goes back with a breathable membrane under the battens, so yes. It keeps out wind-driven rain that gets past the tiles, and because it breathes, it also helps the roof space stay drier than the old open-tiled roof did.
Next door on our Belmont Rise semi is not re-roofing. Can we do our half on its own?
Yes. The new covering stops at the party wall line, and the join at the ridge and hip is finished so that both halves stay weathertight. We talk to you about matching the tile as closely as practical, so the pair still looks like one building.