One half of a shared roof
The council houses in the eastern middle of Stanley Road and Stanhope Road went up in the 1930s, with privately built semis and terraces among them. On the semis and terraces, two or more houses sit under one roof, with a ridge running across them and, often, a chimney stack on or near the party wall.
When one of those roofs is worn out, the re-roof stops at the party wall. The new tiles meet next door's old ones along the ridge and down the line of the wall, and the stack, if it is shared, belongs partly to your neighbour. A good job here is one where you cannot see from the street that only half was done, and where the junction stays watertight for as long as the new roof does.
That means talking to the neighbour before the scaffold goes up. Their side of the ridge, their half of the stack and their gutter all sit close to the work, and some of it may need touching to make a clean finish.
Stripping back to the rafters
On a re-roof, scaffolding goes up first and the garden is protected. We strip the tiles, battens and felt back to the rafters and check the timbers, including the wall plates, where rot often starts on older houses. Anything unsound is replaced. Then a breathable membrane, new battens and the new covering laid from the eaves up, with new ridges, hips and lead. If we find extra timber damage once the old roof is off, we stop, show you and price it before carrying on.
At the party wall we cut and bed the new tiles to meet next door's, and at a shared stack we renew the lead on our side and check the pointing on the whole stack, since a weak joint on the neighbour's half can still let water into yours. Liam, our Lead Roofer, looks at the roof, the loft and the access before we price it.
With the scaffold already up, it is a sensible time to renew the fascias and soffits and gutters on the same scaffold. If you are not sure the roof is past repairing, a roof inspection on the hill with drone photos and a look in the loft gives you the evidence first.

Building Regulations and a warmer loft
A replacement that does not materially change how the roof looks generally does not need planning permission, but the Planning Portal says most re-roofing does need Building Regulations approval. In practice that often means bringing the loft insulation up to current standards where it is practical, and making sure the roof space still has air moving through it once the new membrane is on.
On a 1930s house that was built for coal fires, with flues and draughty windows carrying moisture away, that ventilation point matters. Thick insulation pushed tight into the eaves can block the airflow and leave the timbers damp. We look at how air gets in at the eaves and out near the ridge before the new covering goes on.
Stanley Park itself is not in a conservation area. Carshalton Park, to the north, sits inside one, so if your house is towards Ashcombe Road or Ruskin Road and you are thinking of changing the covering, check with Sutton Council first. More on materials is on our main roof replacement page.
Frequently asked questions
Our neighbour on Stanhope Road does not want to re-roof. Can we still replace our half?
Yes. The new roof stops at the party wall and is bedded neatly against their tiles along the ridge. We will need to work close to their side, so let them know the dates, and if their half of a shared stack is in poor shape we will tell you both.
The loft of our Stanley Road house still has the old black felt. Is that a reason to re-roof on its own?
Not on its own. Old felt that is intact can keep going. If it has torn, sagged or crumbled along the eaves, and the tiles above are slipping too, the roof is near the point where a full replacement makes more sense than repairs.
Will a new roof make our 1930s house warmer?
It can help. The loft insulation usually has to be brought up to standard, and a new membrane cuts draughts through the tiles. The bigger gains still come from the insulation itself and the windows.






