Having an emergency? Call us now, 24/7
Chimney stack on a red tiled roof, seen from the scaffold during roof work

Chimney Repairs in West Barnes

When a West Barnes loft was converted, the party-wall stack often ended up beside a new gable or rising out of a dormer roof, and the leadwork fitted round it then is usually the first to leak.

About 1.6 miles from our Kenley Rd baseKT3, SW20Open 24 hours, 7 days
  • 10 Year Guarantee
  • Free Quotes, Often Same Day
  • Family Run for 20+ Years

Get your free quote

Tell us what’s going on and we’ll call you back, usually the same day.

Free, no-obligation. 20% discount for OAPs. We only use your details to reply to you (privacy policy).

Where a conversion meets the stack

The interwar houses on Phyllis Avenue, Arthur Road and the streets round them were built with brick stacks, usually rising from the party wall between two houses. Many of those houses were extended after the war, often with loft conversions, and that changed how the stack sits in the roof.

A hip-to-gable conversion can leave the stack close to the new gable wall, with fresh tiling cut tight round its base. A rear dormer can bring the stack up against a dormer cheek, or leave it standing in the middle of a small flat roof. In each case, the lead round the stack was fitted when the loft was converted, not when the house was built, and it was fitted to a junction the original roof never had.

Those junctions are awkward to weather. Where a stack meets a dormer cheek, there is often barely room for a proper step flashing, and the gap gets filled with mortar or sealant instead. Where a stack stands in a flat dormer roof, the covering has to turn up the brickwork with a flashing over it, and a pond on that roof sits right against the stack. That is why, on a converted house, the stack junction is the first thing we look at.

An unconverted stack after ninety winters

A stack that nobody has touched since the house was built fails in a familiar order:

  • The lead flashing where the stack passes through the tiles lifts, splits or works loose as the mortar holding its top edge into the brickwork crumbles.
  • The flaunching, the sloped mortar bed round the pots, cracks and lets water into the top of the stack, and the pots loosen.
  • Open joints in the brickwork soak up rain, which freezes and pushes the joints wider.
  • Old sealant patches look tidy for a year or two and then peel away from the brick.

Very few of these flues carry smoke now, and a stack that is not used is easy to forget until a stain appears in a bedroom or on the landing. On a party-wall stack, a cracked flaunching lets water into brickwork that both houses sit against, so the first sign can turn up next door.

Red brick gable with tall chimney stacks and clay pots rising above a grey slate roof
Tall brick stacks catch the most wind and rain of anything on the roof. Photo: Athira Anil on Pexels

Seeing it, then fixing it

The drone goes up to the stack first, flown from your garden, so you see the pots, the flaunching and both sides of the lead in close-up before any ladder or scaffold is booked. From the loft, the brickwork round the base of the stack shows whether water is getting in and on which side.

The repair can include new lead flashing dressed into the brick joints, repointing, new flaunching with the pots reset, and caps or ventilated cowls on flues that are no longer used. On a converted house, it often means reworking the stack-to-dormer junction properly, with soakers and a step flashing or a correct upstand where the flat roof meets the brick. Tiles round the stack are done on the same visit as part of a West Barnes roof repair. If the dormer roof itself is past saving, see flat roof re-covers in West Barnes.

As a guide figure, MyJobQuote lists full chimney leadwork replacement at £350 to £460 without scaffolding. The main chimney repairs page describes each job, and our article on chimney flashing problems on interwar streets covers the same kind of stack a few miles away.

Frequently asked questions

We had a rear dormer built beside the stack on our semi. Why does it leak only in driving rain?

Wind-driven rain gets into gaps that ordinary rain misses, often where the dormer cheek meets the stack or where tiles were cut short round it. The photos usually show which side is open.

Our hip-to-gable conversion left the stack hard against the new gable wall. Is that a problem?

Not in itself, but the junction needs proper lead. Where the stack, the new gable and the old tiles all meet, look for a stepped flashing dressed into the brick rather than a mortar fillet. Mortar fillets crack within a few winters.

The lead round our stack has been painted with black sealant. Will that hold?

For a while. Sealant over cracked lead usually fails within a few years and traps water underneath. A proper repair is new lead with its top edge set into the mortar joints.

Our stack still has an old TV aerial strapped to it. Can that cause damage?

It can. A large aerial catches the wind and works the stack every time it blows, and the straps can cut into soft brick or old pointing. If the aerial is no longer used, have it taken down while the stack is being repaired.

Recent work from our crews

See more of our work

Hipped tiled roof with roof windows and scaffolding.
Tiled pitched roof with roof windows and a dormer above a house.
Newly installed flat roof felt system on a residential property overlooking surrounding homes.
Commercial roofing job in Wimbledon, with a ladder up to the roof edge of a drive-thru unit.
Red roof tiles above guttering along the eaves.
Dark flat roof surface around a rooflight.

Chimney Repairs near West Barnes

West Barnes is about 1.6 miles from our Kenley Rd base in Morden. See every area we cover.

Chimney Repairs in nearby areas (miles from West Barnes)

Not sure we cover your street? Call 0330 133 4111 with your postcode.

Precise Roofing & Guttering LTDKenley Rd, Morden SW19 3JJ

Open in Google Maps Get directions

Chimney Repairs in West Barnes

Free quotes in West Barnes, often the same day you call.