One half of a pair
Hackbridge's interwar streets are mostly semi-detached pairs, so a semi on one of the streets off London Road shares the ridge across the party wall, and usually the chimney stack, with the house next door. That matters more than anything else when one half is re-roofed and the other is not.
A new roof on your half has to meet the old one on the party wall in a way that keeps water out of both. The new tile has to sit next to the old one without making the pair look odd from the street. And the scaffold, the skip and the stack all sit close to next door's side. We plan those three things at the quote stage, and on most jobs it is worth speaking to your neighbour before the scaffold goes up. Sometimes the conversation ends with both halves being done at once, which gives the neatest result.
What usually tips a roof from repair to replacement is the fixings giving up across the whole roof rather than in one place: tiles slipping on a different slope each winter, felt rotted along the eaves, battens that crumble when a few tiles are lifted. If you are seeing only one fault, a targeted roof repair may well do, and that page sets out the common faults on these houses.
Tile weight and the timbers under it
A re-roof is a chance to change the covering, and unless the house is listed you usually can. The thing to watch is weight. Concrete tiles are heavier than many of the clay tiles they replace, so before recommending a change we check the rafters, purlins and struts in the loft. On roofs of this age it is common to find a few timbers that need strengthening or replacing anyway, and that is far easier to do with the old covering off.
Looks matter too. On a pair of semis a change of tile or colour will show, so it is worth agreeing with next door if you can.
The job runs in a fixed order: scaffold and protection, strip the old tiles, battens and felt, check and repair the timbers, lay a breathable membrane, fix new battens at the gauge the tile needs, then tile from the eaves up and finish with the ridge, hips, valleys and lead. With the scaffold up, it is also the cheapest moment to renew the fascias and soffits and gutters.
On cost, Checkatrade's roof replacement guide gives a UK average of around £8,000, with most owners paying between £4,000 and £19,000. Your own figure depends on the size and shape of the roof, the tile and what the timbers need, and the free quote sets it out line by line.

Paperwork for a Hackbridge re-roof
Re-roofing more than a quarter of a roof is controlled work under Building Regulations. It is usually self-certified by the roofer through a competent person scheme, or notified to building control, and we tell you which applies to your job. Like-for-like re-covering is normally maintenance and does not need planning permission.
The exceptions in Hackbridge are the handful of listed buildings round the Green, where a change of covering needs listed building consent and repair in matching materials is nearly always the answer instead. Those are covered on the roof repair page. If you are adding to the roof rather than replacing it, such as a new dormer, check your address with Sutton Council first.
Our guide on how long a new roof lasts gives the published lifespans for each covering, which helps when weighing a cheaper tile against a longer-lasting one.
Frequently asked questions
Is a re-roof the time to deal with the shared chimney stack on our Hackbridge semi?
Yes. The scaffold is already there, so renewing the lead flashing and repointing the stack costs far less than doing it later. If the stack is on the party wall, agree it with next door first. Our Hackbridge chimney repairs page covers the leadwork.
Can our half of a Hackbridge pair be re-roofed if next door's stays as it is?
Yes. The join runs along the party wall, where the new membrane, battens and tiles are finished against the old roof so neither side lets water across. We choose a tile as close to theirs as we can find.
Is a re-roof a good time to improve ventilation on a 1930s house off London Road?
It is one of the easiest times. Many interwar roofs were built with very little ventilation, and a breathable membrane with eaves ventilation helps keep the loft dry. We raise it at the quote so you can decide.