Having an emergency? Call us now, 24/7
Large residential property undergoing roof renovation with scaffolding across the front elevation.

Roof Replacement in Mitcham Junction

The 30 houses that were Tramway Terrace share one long roofline, seen from the common across the road. A new covering on one of them has to sit in that line and meet next door's at both party walls.

About 2.2 miles from our Kenley Rd baseCR4Open 24 hours, 7 days
  • 10 Year Guarantee
  • Free Quotes, Often Same Day
  • Family Run for 20+ Years

Get your free quote

Tell us what’s going on and we’ll call you back, usually the same day.

Free, no-obligation. 20% discount for OAPs. We only use your details to reply to you (privacy policy).

One roof in a row of thirty

Mitcham History Notes records 30 houses in Tramway Terrace, numbered 1 to 30 from south to north and shown on the 1894 Ordnance Survey map. In 1925 they were renumbered as 24 to 53 Carshalton Road, the numbers they carry today. The Merton Historical Society adds that the row was built on former common land and that its southernmost house once carried the date 1882 high on its gable. Seen from the common across the road, the fronts form one long roofline.

That shapes how a re-roof here should look. A new covering in a colour, size or profile that jars with the houses either side shows from a long way off, because the row faces open ground. We bring samples, look at what your neighbours have, and talk through which coverings sit well in the line before you choose.

It also shapes the work at the edges. Your roof finishes at the party walls, and the new covering has to meet next door's older one in a straight, watertight joint at each end. We explain how those joints will be made, and what we will do if the neighbour's edge tiles are loose, before the scaffold goes up.

What an 1880s roof may be hiding

A roof this old has usually been re-covered at least once, and the question is what with. If a lighter original covering was swapped for heavy concrete tiles at some point, the rafters have been carrying more weight than they were cut for. A dip between rafters or along the ridge is the clue. We check the timbers from the loft before quoting and again once the old covering is off.

A full replacement takes off the covering, the old felt or underlay and the battens, back to the rafters. Anything rotten or sagging is repaired or replaced, then a breathable membrane, new battens and the new covering go on, with the ridge, valleys and flashings done new. Liam, our Lead Roofer, looks at the roof, the loft and the access first, and the quote covers materials, scaffold and waste. If something unexpected turns up under the old covering, we show you and agree it before doing more.

Price depends mostly on roof area, covering and access. A small mid-terrace roof is at the modest end of most published guides, though carrying scaffold and materials along Tramway Path to the back can add to it. Our guide to how long a new roof lasts compares the coverings.

Concrete tiled roof with a brick chimney and a fixed roof ladder hook against a blue sky
A re-covered roof can include fixed safety hooks for future maintenance access. Photo: Hert Niks on Pexels

Insulation, now the loft is open

Two recent energy certificates for houses in this row, Nos. 35 and 49, record solid brick walls and lofts with 100 mm of insulation or none at all. Re-roofing more than half of a roof usually brings in the Building Regulations, including improving insulation where it is practical. On a small terrace loft that means thinking about airflow at the same time, because a well-insulated loft under a new covering can trap moisture if air cannot move through it.

We explain what applies to your house when we quote. With the scaffold up, it is also the cheapest moment to renew the fascias and soffits on the same house. The main roof replacement page sets out the process in full.

Frequently asked questions

Our Carshalton Road roof has a dip halfway along. Does that mean the whole thing is coming off?

Not on its own. A dip often means one or two rafters have bent under a heavy covering. If the rest of the roof is sound, a repair may do. If the covering is also failing on both slopes, a re-roof lets us straighten or double up the rafters while everything is open.

What happens at the party walls if only my house in the row is re-roofed?

We stop the new covering at your party walls and make a neat, watertight joint with each neighbour's roof. If their edge tiles are loose, we tell them and you before we start, so nobody is surprised.

Is re-roofing an Aspen Gardens semi a bigger job than a terrace house?

Usually. A semi has more roof area than a narrow terrace house, a longer ridge and an end that is not protected by a neighbour, and many here have a second roof over an extension. We price each part separately, so you can see where the cost sits.

Recent work from our crews

See more of our work

Tiled pitched roof with roof windows and a dormer above a house.
Newly installed flat roof felt system on a residential property overlooking surrounding homes.
Commercial roofing job in Wimbledon, with a ladder up to the roof edge of a drive-thru unit.
Red roof tiles above guttering along the eaves.
Dark flat roof surface around a rooflight.
Black gutter and corner joint beside a tiled roof edge.

Roof Replacement near Mitcham Junction

Mitcham Junction is about 2.2 miles from our Kenley Rd base in Morden. See every area we cover.

Roof Replacement in nearby areas (miles from Mitcham Junction)

Not sure we cover your street? Call 0330 133 4111 with your postcode.

Precise Roofing & Guttering LTDKenley Rd, Morden SW19 3JJ

Open in Google Maps Get directions

Roof Replacement in Mitcham Junction

Free quotes in Mitcham Junction, often the same day you call.