Extension roofs on the 1930s semis
Aspen Gardens went up in the early 1930s just south of the station, and on semis and detached houses like these, new roofs usually go at the back or side: a single-storey kitchen at the back, a side extension, a garage or a garden room. One recent certificate on the road describes a solid brick main house with a cavity-walled extension under its own pitched roof, which is the usual shape of a house that has grown.
Before quoting an extension roof we look at three things. First, the pitch it can have under the first-floor windows, because that decides whether tiles to match the house will work or whether a flat roof is the better choice. Second, how it meets the old wall. Third, where its rainwater goes. A new extension often needs its own gutter and downpipe, and we can price gutters for the new roof in the same quote. If you are still weighing up a pitched against a flat finish, our article comparing flat and pitched roofs sets out the trade-offs.
For scale on a small flat roof, MyJobQuote's flat roof construction guide gives a national figure of £1,650 to £2,400 for an EPDM roof on a single garage of about 15 square metres. That is a published guide, and our own figure follows a visit.
Wanting a new roof on the house itself?
Many people who search for a new roof mean the main roof of the house they already live in. On the old terrace and the 1920s houses north of Arneys Lane, that usually means stripping a worn covering and putting a new one on the existing rafters, which is our re-roofing page for these houses. Where the rafters themselves have sagged badly or been cut about by old alterations, part of the structure may need rebuilding before the covering goes back on, and we tell you that after looking from the loft.
Building a roof where there was none, on a new extension, a dormer or a new-build plot, is what this page is about. The two jobs are priced differently, so it helps to say which you have in mind when you ring.

Roof rooms over solid brick
The energy certificate for 14 Tramway Path records a roof room, so at least one house on the path has been converted. A rear dormer usually has a flat top, clad cheeks and lead where its edges meet the old slope. On a house built before 1894, those junctions have to meet battens and rafters well over a century old, and they are where a new roof on an old house leaks if it is going to. Liam, our Lead Roofer, runs installations with Jed and Gurpret, and those details take most of their time.
The Planning Portal notes that a loft conversion can only be permitted development on a house outside designated land such as a conservation area. Merton's appraisal of the nearby Cricket Green conservation area does not describe the terrace or Tramway Path as part of it, but check your address with the council, and the size and position limits still apply. A dormer close to a party wall is also likely to bring in the Party Wall etc. Act 1996, which your surveyor or builder normally handles.
Scaffold and deliveries along Tramway Path
The Merton Historical Society describes Tramway Path as the old bridleway that now serves as a rear accessway to houses built towards the end of the 19th century on former common land. For a rear dormer or a kitchen roof on the terrace, it is how the scaffold, timber and covering reach the garden without coming through your hallway. On the first visit we walk the route and plan where a lorry can stop on Carshalton Road and how long the path will be partly in use. The main roof installation page covers materials in more depth.
Frequently asked questions
Can the scaffold for a rear dormer on Carshalton Road go up from Tramway Path?
Usually, yes, but it depends on the width of the path at your house and whether neighbours need to get past. We check it on the first visit and plan the scaffold, deliveries and skip around what we find.
My Aspen Gardens house is solid brick but the extension is cavity wall. Does that change how the new roof is tied in?
It changes the detail at the junction. Flashing into solid brick is cut into a mortar joint of the old wall, and a cavity wall may need a cavity tray above the new roof so water inside the cavity is turned out rather than in. We check what is there before we decide.
Our kitchen extension behind a 1920s house on Carshalton Road is going up next year. When should we involve a roofer?
At the drawings stage if you can. The pitch, the covering and where the water drains are easier to settle on paper than once the walls are built, and it avoids a roof that cannot meet the old house cleanly.






