A new roof on the whole house
If you are searching for a new roof on a Rosehill semi, you most likely mean the main roof: the tiles are slipping in several places, the felt underneath has perished, and patching no longer holds. On a house of this age a new roof normally means stripping the old tiles, battens and underlay back to the rafters, repairing any tired timber, then laying a breathable membrane, new battens and new tiles, with fresh lead at the stack and new ridge and hip work.
That job has its own page, because on a semi it comes with particular questions about the shared ridge, the party wall and the insulation the rules now require. Our page on roof replacement in Rosehill covers it step by step. The rest of this page is about the other kind of new roof: one built on new structure.
When the house grows: Rose Hill Park West as an example
Energy certificates for one Rose Hill Park West semi record its floor area rising from 113 to 163 square metres between 2014 and 2024, with the roof now insulated at the rafters, which suggests a loft conversion. Certificates are not measured surveys, so treat the figures as a guide, but the pattern is familiar on interwar pairs with decent plots: a room in the roof, a bigger kitchen at the back, perhaps a side addition.
Each of those needs a roof of its own. A rear dormer cuts into a slope whose battens and tiles may be original, so we check what we expose around the opening and replace tired battens locally before weathering the dormer cheeks and apron. A flat roof over a single-storey extension needs a proper upstand where it meets the 1930s back wall, with lead or a matched flashing dressed into the brickwork rather than a bead of sealant. A pitched roof over a side addition runs into the house at a valley or abutment, which is where it will leak if it is rushed.
For flat roofs we fit GRP fibreglass or EPDM rubber, and our page on flat roofs in Rosehill compares them. For pitched roofs we choose tiles to sit well beside the existing ones. On a semi your roof is half of a shared shape, so a dormer or a new gable changes how the pair reads from the street. If an exact match to tiles of this age is not available, we show you the closest options, including reclaimed tiles, before anything is ordered.
On site the order is structure, deck or rafters, insulation, membrane and battens, then the covering. Gutters and fascias go on last, sized for the new roof and joined into the existing run so it drains cleanly.

Planning on Rosehill's side streets
Most of Rosehill's own streets are outside any conservation area, so many rear dormers here can go ahead as permitted development within the size limits. Sutton does have a 1984 Article 4 Direction that removes roof alteration rights on a number of properties across the borough, so check your address on the council's Article 4 page before you design anything. Sutton Garden Suburb, just over the Benhilton side, has its own controls, which our Sutton roof installation page explains. Building Regulations apply to almost every new roof, and a dormer on a semi can bring in the Party Wall Act because it works close to the shared wall.
We start every job with the drawings and a look at the existing roof, so the quote reflects what is really there rather than what the plans assume. Our main roof installation page sets out the full process.
Frequently asked questions
Our Rosehill Gardens semi has an old lean-to at the back. Can you take it off and roof the new extension?
Yes, once the new structure is built. We strip the old lean-to roof, check where it was fixed to the house wall, make good the brickwork and flashing line, then build the new roof onto the extension. Old lean-to junctions often hide damp in the wall, so we look before we cover it up.
Can we put a new roof on our half of a Rosehill pair if next door keeps their old one?
Yes. On a semi it is common for one half to be re-roofed years before the other. The care goes into the shared ridge and the line over the party wall, where your new covering meets theirs. We look at next door's tiles before choosing yours so the pair still reads as one from the street.
Will cutting a dormer into the main roof disturb the rest of the tiles?
Some, around the opening. On an older roof we check the battens and tiles we disturb and replace any that will not hold. If the whole slope is near the end of its life, we say so, because it can make sense to re-cover that slope while the scaffold is up.






