A whole new roof on a 1930s semi
If the roof on your house is worn out and you want it taken off and replaced, that is the job our Morden Park roof replacement page walks through, including the stepped scaffold on Rougemount Avenue. The rest of this page is about new roof structures: a converted loft, a rear extension or a new roof shape on an existing house.
What Merton asks for on the Rosedene Avenue streets
Merton Council's character study for Morden Park treats the 1930s streets around Rosedene Avenue, Rutland Drive, Hartland Avenue and Torrington Way as one character area, and it has two clear pieces of guidance on roofs. Alterations should take their lead from the original detailing and materials, and roof lights should go on the rear slope wherever possible. It lists roof lights added to front slopes as one of the things that have eroded the look of these streets.
On a house outside a conservation area, rear extensions and many loft conversions can go ahead under permitted development if they stay within the limits, though front dormers are a different matter. Check with Merton if you are unsure which side of the line your house is on. The Planning Portal's loft conversion guidance sets out what is allowed without an application. Building Regulations approval is a separate step and applies to almost every new roof over living space.

Loft conversions and rear extensions on a 1930s pair
The houses here were built as matching pairs and short terraces, so any new roof is judged against the house next door. Three kinds of job come up on houses like these.
- Hip-to-gable lofts. Where a semi has a hipped roof, a loft conversion often builds the hip up into a gable and adds a dormer at the back. The new gable sits beside an unaltered neighbour, so the tiles, the ridge line and the verge detail all need to line up with the original slope.
- Rear dormers. A dormer cheek that is not properly weathered into the main tiles is the most common source of leaks on a converted loft. We lead or flash every edge where the new structure meets the old covering.
- Single-storey rear extensions. Usually a flat roof in GRP fibreglass or EPDM rubber, or a lean-to tiled to match the house, often with a rooflight. The detail that matters is the upstand or flashing where the new roof meets the back wall, which on these houses may be pebbledash or render rather than plain brick. Our Morden Park flat roofing page goes into the coverings.
Every new roof is built in layers: deck or rafters, a breathable membrane, battens set to the gauge of the chosen tile, the covering itself, then lead flashing dressed into the existing brickwork. Liam, our Lead Roofer, runs the job on site with Jed and Gurpret.
Inside the Upper Morden Conservation Area
The two estates off Green Lane sit inside the Upper Morden Conservation Area, designated in 1986. The appraisal describes steep hipped roofs, pantiled on the blocks north of the road and a mix of pantile and tile to the south. A new roof there follows the steep pitch and the existing tile, and extensions and dormers are more likely to need planning permission, so speak to Merton's planning team before drawings are fixed.
Cost and time on site
Access to the back garden, the number of edges and rooflights, and whether a pitched roof needs tiles sourced to match a 1930s original all move the price. Homebuilding & Renovating's national cost guide is a useful starting point for budgeting a new roof before you have drawings.
Time on site depends on the shape. A garage or a small extension roof is usually a matter of days once the walls are up, while a hip-to-gable with a rear dormer takes longer, and membranes, flashing and flat roof coverings all need dry weather. Your quote includes a rough timescale. Still choosing between a flat and a pitched roof for the extension? Our Morden flat-or-pitched comparison weighs them up.
Frequently asked questions
Can I put roof lights on the front slope of my house on Rutland Drive?
It may be possible, but Merton's character study for these streets asks for roof lights on the rear slope wherever possible, and front-slope roof lights are one of the changes it flags. We would plan for the back unless there is a strong reason not to.
My extension will meet a pebbledashed back wall on Torrington Way. How is that joint kept dry?
The render is cut back along the line of the new roof so the lead flashing or upstand can be dressed into the brickwork behind it. It is the joint most likely to leak on these houses if it is rushed.
Do the Upper Morden estates allow new roofs at all?
Yes, but the bar is higher. The appraisal asks for materials and designs that suit the estates, so a new roof there keeps the steep pitch and the existing pantile or tile, and planning advice from Merton comes first.






