A whole new roof on an interwar house
Hamilton Avenue, Oldfields Road, Stayton Road and most of the ground west of Ridge Road and Forest Road towards Stonecot Hill were built between the wars. When a roof like that is worn out, a new one goes on over the same rafters: the old tiles and battens come off, the timbers are checked and repaired, and a breathable membrane, new battens and new tiles go on, with fresh lead at the stack and every wall.
That job is covered in detail on our roof replacement page for Sutton Common, including the clay plain tile roofs on the Hallmead Farm Estate. Like-for-like re-roofing is normally treated as maintenance and does not need planning permission, though the council should be asked if you want to change the covering on a house in a designated area.
What makes it an installation rather than a straight replacement is a change to the roof itself. On a semi near Stonecot Hill that might be a heavier tile replaced with a lighter one, a roof raised to take a loft room, or a hip rebuilt after earlier work left it out of line with next door. Any of those means checking that the rafters, purlins and wall plates can take the new load before a price is given.
Pitched and lean-to roofs over new rooms
The interwar streets here were not built to one design, so houses a few doors apart can have quite different roofs, and many have been extended since. The new roofs we build on them are usually one of these:
- a lean-to over a single-storey kitchen extension, running up to just below the first-floor windows
- a small pitched roof over a new porch or side extension, hipped to match the main roof
- a pitched roof replacing an old flat roof on a garage or rear room
The roof over the new room is the simple part. Where it meets the house is where the care goes: a lead apron or stepped flashing chased into the brickwork at the abutment, soakers under the tiles at the sides, and enough pitch for the tile chosen. A lean-to that is too shallow for its tile will let wind-driven rain back up under the laps. If your extension is to have a flat roof instead, the coverings are on our flat roofing page for Sutton Common.

Building on the Hallmead Farm Estate
Houses on Blenheim Road, Coombe Walk and the estate's parts of Hallmead Road and Sutton Common Road sit in the Hallmead Farm Estate Area of Special Local Character. That does not remove permitted development rights, but the estate's 2021 character appraisal, prepared by residents with Sutton Council, sets out a checklist the council takes into account when it decides a planning application.
For a new roof, three points in it matter most. Extensions should be subservient to the house in height, scale and massing. The Dutch hipped roof style should be kept. New tiles should match the main roof, the bay roof and the door canopy. In practice that tends to mean a rear dormer set well down from the ridge that leaves the hip ends alone, and a single-storey extension kept low, with a lean-to in matching red clay plain tiles. Your architect or the council decides what is acceptable, and we build the roof to the drawings. The Planning Portal's loft conversion guidance is a useful first read.
More on how each stage runs is on our main roof installation page.
Frequently asked questions
We want a rear dormer on our Blenheim Road semi. What does the estate checklist ask for?
That the dormer stays subservient to the house, that the Dutch hipped roof shape is kept and that the tiles match. A dormer set back from the hips and below the ridge is far more likely to meet those points than a hip-to-gable conversion that squares off the end of the roof.
Our semi off Forest Road has a flat-roofed back room. Can it have a pitched roof instead?
Often, yes, if the walls are sound and there is enough height below the first-floor windows for a workable pitch. We measure that on the survey. If the pitch would be too shallow for tiles, we say so before anything is priced.
Our Hamilton Avenue house has heavy concrete tiles. Can a lighter roof go on when it is replaced?
Usually, yes. Swapping to a lighter tile takes load off the timbers. Going heavier, for example from concrete to clay, needs the rafters and purlins checked first, and sometimes strengthened. On a semi, it is also worth talking to next door, since the two halves share a ridge.






