Paved front gardens and Policy 8
The Stoneleigh and Auriol Neighbourhood Plan says surface water causes most of the flooding in the area during heavy rain, and points to the amount of ground, especially front gardens, that has been covered in concrete and other hard surfaces. Its Policy 8 asks new development and extensions that need planning permission to use soakaways or other sustainable drainage, and to capture water in butts where possible.
A gutter replacement on its own does not need planning permission, but it is the right moment to fix where the roof water goes. On some houses a downpipe has been cut short over a paved drive or left emptying against the wall since the driveway went down. New gutters with downpipes that run into the drain, a soakaway or a water butt keep that water off the paving and out of the road.
Three gutter systems on one Stoneleigh semi
On a 1930s chalet semi the gutters have often been replaced in stages: the front when the windows were changed, the back when the kitchen was extended, the dormer when the loft was converted. The result is often three profiles of three ages, joined with adaptors that leak.
New guttering is worth it when:
- the plastic has gone brittle and cracks when handled
- the same joints are resealed every winter
- the house, extension and dormer each have a different system
- the roof, fascias or soffits are being replaced anyway
We fit one profile and colour across the whole house where we can. uPVC is the usual choice; aluminium lasts longer and comes in coated colours; cast iron suits an owner who wants the traditional look. For long runs with fewer joints, see seamless gutters in Stoneleigh. If the fascia boards will not hold new brackets, they come first, as covered on our Stoneleigh fascias and soffits page.

Sizing for a steep 1930s roof
The AECOM design codes describe the roofs here as steep. A steep slope delivers rain to the gutter fast, so in a cloudburst a narrow gutter, or one with a single outlet at the end of a long run, can overflow while perfectly clean. We look at the roof area feeding each run and set the profile, the number of outlets and their positions to suit, with brackets close enough to hold the run straight when it is full. A deeper profile or an extra downpipe often does more than simply going up a size.
For a ballpark, Checkatrade's gutter replacement guide gives fitted uPVC at roughly £30–£70 per metre.
Where each downpipe ends
We follow every downpipe to the ground. Where it meets a gully or drain connection, we make sure the joint is sound. Where it stops short over paving, we extend it to the nearest drain, or fit a diverter into a water butt with an overflow back to the drain. Building a new soakaway is groundwork and needs a drainage contractor, but we can leave the downpipe ready for one. The main gutter installation page explains the materials in more depth, and the quote for a new system is free, often the same day.
Frequently asked questions
Our Stoneleigh Chalet has its dormer, kitchen extension and main roof on three different gutters. Can you put them all on one system?
Yes, usually. We replace each run in the same profile and colour and size the outlets for each roof. If one run is fairly new and sound, we can match the rest to it rather than replacing everything.
Our downpipe empties onto the paved front drive. Can you take it somewhere better?
Yes. We can run it into the existing drain, or into a water butt with an overflow, which is what the Neighbourhood Plan encourages. A new soakaway needs a groundworker, and we can leave the pipe ready for one.
Can new gutters on our half match the profile next door on our Stoneleigh pair?
Usually. Where the neighbour's run is sound, we fit the same profile and colour up to the party wall and make a sealed joint, or a stop end on the line if the two systems cannot be joined. Either way the pair keeps one gutter line along the front.