A whole new roof, or a new piece of one
On a Stoneleigh house, a new roof usually means replacing a 1930s covering that has reached the end of its life. That job, stripping the old tiles, battens and underlay and putting a complete new roof on, is set out on our page for roof replacement in Stoneleigh, including how it works on one half of a semi.
The rest of this page is about the other kind of installation: building a new pitched roof where there was none before. On a chalet semi that usually comes with a loft room or an extension. The Stoneleigh and Auriol Neighbourhood Plan records that an increasing number of homes have been extended into the roof space, to the back and to the side. The new roof sections we form include:
- Hip-to-gable conversions. Your builder raises the new gable wall, and we form the new section of main roof over it, with fresh battens, tiles, a new verge and a ridge carried through to the end.
- Pitched dormers. Small gable or hipped dormers with a tiled roof, set into the slope with lead soakers and flashings.
- Side extensions with a pitched roof. A lean-to, or a roof that meets the main slope in a valley.
- Garages and porches. Smaller pitched roofs that still need a proper abutment flashing where they meet the house wall.
For flat-roofed extensions and dormer tops that already exist and need repair or re-covering, our Stoneleigh flat roofing page is the right place.
Hipped chalets and Policy 1
The AECOM design codes for Stoneleigh and Auriol use a hipped-roof semi in off-white render and red brick as their example of the typical Stoneleigh Chalet, though gables are the more common roof across the area. A hipped roof slopes in at the side, which leaves little headroom in the loft, so a loft room on one of these often starts with a change to the roof itself.
Stoneleigh has no conservation area, but since March 2026 it has had its own planning policies. Policy 1 of the Neighbourhood Plan asks that property changes keep a consistent building line and complement the form, massing and roofscape of nearby houses, taking in the slope of the land where it matters. It points to the AECOM codes for the detail.
Those codes say the original building should stay the dominant element, however many extensions it has. Their illustrations show a long shed dormer that is out of scale with the original house, and gable dormers that ignore the rhythm of the windows below, as examples to avoid.
Not every loft conversion needs planning permission, and whether yours does is a matter for your architect and Epsom and Ewell Borough Council. The codes are a useful brief for the roof either way: keep new sections in proportion and use a matching pitch where you can.

Matching red and grey 1930s tiles
The codes describe pantiles and concrete tiles, mostly red or grey, on steep pitches. New battens go on at the same gauge as the old so the courses line up across the join, and each dormer cheek gets a lead soaker under every course rather than a bead of sealant. A valley between a side extension roof and the main roof is lined in lead or a proper valley trough, wide enough to keep working with a few leaves in it.
Finding an exact match for an old concrete tile is not always possible. Where it is not, we show you the closest options before ordering, and can move sound original tiles from a hidden slope onto the side people see. Still deciding on a side extension's shape? Our article comparing a flat roof and a pitched roof sets out the trade-offs.
Usually your builder puts up the walls and the frame and we build the roof on top: membrane, battens, tiles, leadwork, ridge and verges, then the gutter and roofline boards. We agree the eaves and junction details with the builder or architect before work starts. New roofs normally need Building Regulations sign-off, and we work to the approved drawings. We have been a family run firm for over 20 years, and the quote for a new section is free. More is on our main roof installation page.
Frequently asked questions
Our chalet semi still has its original tiles. If we add a gable, does the rest of the roof need re-covering too?
Not necessarily. If the old tiles are sound, the new gable section can be tiled to match and the rest left alone. If the inspection shows the old slopes are near the end of their life, doing the whole roof while the scaffold is up usually costs less than coming back for it in a few years.
How do you stop a new valley over a side extension filling with leaves from the street trees?
We make the valley wide enough to carry water past a layer of leaves and line it properly, so a bit of debris slows the water rather than pushing it under the tiles. It still needs clearing in autumn, which is a quick job from a ladder.
Does the Neighbourhood Plan stop me building a full-width rear dormer?
The plan does not ban dormers. If yours needs planning permission, the council will weigh it against Policy 1 and the AECOM codes, which treat a long shed dormer out of scale with the house as an example to avoid. Your architect can tell you whether permission is needed and what size is likely to be accepted.