If your house already has a roof and it has worn out, what you need is a re-roof, which our page on roof replacement in Worcester Park covers. This page is about building a roof where there was not one before.
Kitchen extensions behind the semis
The commonest new roof on the Sutton side of Worcester Park sits on a single-storey extension at the back of a 1930s semi. Sutton's draft Character Study describes the housing around the station as Metro-land semis and short terraces with private front and rear gardens, and the rear garden is where most of these houses grow.
The roof over that extension is usually flat, in GRP fibreglass or EPDM rubber, or a lean-to pitched roof tiled to match the house. A flat roof is laid to fall towards an outlet and turned up the back wall under a lead or proper flashing. A lean-to needs enough pitch for the tiles it carries, which can limit how low the roof meets the house wall under a first-floor window. That is worth settling at the drawing stage, before the walls go up.
In an area that Sutton's drainage plan treats as its most at risk for surface water, it also pays to decide early where the new roof's rainwater goes: into the existing drain, a soakaway or a water butt, rather than onto the new patio.
Building a hip up into a gable
Many interwar semis here have hipped main roofs, which leave little headroom in the loft. A loft room usually means building the hip up into a gable and adding a rear dormer. The new section of main roof has to be covered to match the old, in tiles of the same size, colour and profile, so the pair still reads as one roof from the street. On a Tudorbethan semi, it is also worth deciding how the new gable end will be finished, since the half-timbered gable at the front is part of what makes the pair look like a pair.
Because the loft work runs along the party wall, the Party Wall etc. Act 1996 applies in many cases, and the roof has to be finished cleanly against next door's tiles.

Houses on back-garden plots
The character study notes pockets of back-garden infill across the North Cheam and Worcester Park neighbourhood. A house built on the end of a long garden, or a replacement home on a single plot, needs a complete roof from the wall plate up: structure checked, membrane and battens, the covering from eaves to ridge, then hips, valleys and flashings. We work from the architect's drawings and the Building Regulations approval, and we can take on the roof as a separate package while another builder handles the walls.
Access on an infill plot is often the hardest part. Materials may have to come down a side passage or across a neighbour's drive, and that is worth planning before the scaffold is ordered.
Above the shops near the station
The same study suggests that South Worcester Park's transport links could allow homes across the sub-area to rise by one storey, to three, and points to the district centre and station approach for denser schemes. That is planning guidance, not a permission. Where a scheme does go ahead, the new top floor needs a full roof, which can be pitched or a mansard with a flat top, weathered against the party walls and parapets either side. Our page on flat roofing in Worcester Park covers the flat parts, and the main roof installation page sets out how a new roof is built.
Frequently asked questions
The draft character study says South Worcester Park could go to three storeys. Can I add a floor to my semi?
Not on the strength of the study alone. It is guidance that informs planning decisions. The permitted development right to add storeys to a house only covers houses built between 1948 and 2018, so an interwar semi here needs a full planning application to Sutton. Talk to the council's planners before paying for detailed drawings.
Our semi near Back Green already has a flat-roofed extension. Can it have a pitched roof instead?
Often, yes, if the walls and the height under the first-floor windows allow enough pitch. The extension may need new timbers to carry tiles, and a change of roof shape may need planning permission, so check with Sutton first. We can price it from the drawings once the shape is agreed.
We are building a house at the end of our garden off Green Lane. Can you roof a new build from scratch?
Yes. We need the approved drawings and the structural details, then we price the roof as its own stage: structure, covering, leadwork, ridges and gutters. We agree with your builder when the walls will be ready to take the roof.