Clay under the gardens
The old parish of Cuddington ran from chalk downs in the south, through the Woolwich and Thanet beds, to London Clay in the north. Today's Cuddington houses stand at the clay end.
Clay matters for gutters because it holds water. Rain that runs off a roof and splashes out of a short or broken downpipe does not soak away; it sits in a puddle against the brickwork, wets the base of the wall and keeps the ground soft beside the house. A gutter can be perfectly sound and still cause damp if the water at the bottom of the pipe has nowhere to go.
So a new installation here is as much about downpipes as gutters. Each one should run into the existing gully or drain, or into a water butt whose overflow is piped to the drain. Soakaways are the usual suggestion for a new extension, but in clay they often fill in the first long spell of rain and then overflow back towards the house. Tying into the existing drainage is normally the better answer, and we look for the gullies before we decide where the outlets go.
Sizing new runs for hipped roofs and long eaves
Most of Cuddington's older roofs are hipped, and the long bungalows on The Warren and The Grange have particularly long eaves. A hipped roof sends water to gutters on all four sides, and the corners take water from two slopes at once. If a gutter is too small or the outlets too few, it overflows at the corners in a downpour even when it is clean.
When we replace a system, we work out how much roof drains to each outlet and choose the profile to suit. Half-round is the usual shape on houses of this age. A deeper profile carries more water and can cure an overflow without adding a downpipe. uPVC is the most affordable and needs no painting. Cast iron and aluminium suit owners who want a more traditional look, and on a long, unbroken run there is the option of one-piece aluminium with no joints along the eave.

Replacing tired runs on the interwar semis
On a pair of 1930s semis, your gutter usually stops at the party wall and meets next door's. That join is where a new system can go wrong. If the neighbour has kept cast iron or an older plastic profile, the new run needs the right adaptor so the two line up and the joint does not drip onto your wall. We check what is on the other side before ordering.
The signs that a run is past repair:
- splits along the length of the gutter, not just at one joint
- a run pulling away from the fascia because the brackets have nothing solid to hold
- brittle, faded plastic that cracks when touched
- cast iron rusted through at the joints or outlets
- wet patches on the brickwork that come back after every repair
If it is only one or two joints, repairing the failed section is the cheaper route.
New brackets need sound timber, so the fascia boards are checked first and can be replaced at the same time. The fall is set towards the outlets, every downpipe is connected, and we run water through the whole system before we leave. The gutter installation page covers materials and profiles in more detail.
Frequently asked questions
Would a soakaway work for the downpipe on my extension, given Cuddington's London Clay?
Often not. A soakaway needs ground that drains, and clay usually does not, so it fills and overflows. Connecting to the existing drainage is normally the better answer.
My downpipe just empties onto the patio. Can that be fixed with the new gutters?
Yes. We connect it to the nearest gully or drain, or to a water butt with an overflow into the drain, so the water stops collecting at the foot of the wall.
Can new gutters on a bungalow on The Grange be fitted without scaffolding?
Usually, yes. The eaves on a bungalow are low enough to work from ladders, so the job is quicker and the access costs less than on a two-storey house.






