Nos. 12 to 64 High Street, laid as one design
Nos. 12 to 64 High Street form a three-storey neo-Georgian parade with steeply pitched clay tiled roofs and substantial brick stacks. It is missing from the 1934 map and shown on the 1955 one, according to the council's 2009 appraisal, which puts its roofs at roughly 70 to 90 years old.
Clay tiles can outlast that. What usually gives out first is underneath: the original nails, the battens, and old bitumen felt or no underlay at all. On a steep roof, rusted nails let tiles slide, and once they start slipping across several slopes rather than in one spot, repairs only move the problem around.
The parade was built as a set, and its roofs still read as one. A replacement should keep the same steep pitch, a clay tile in a matching colour and size, matching ridges and hips, and the brick stacks in place. Sound old tiles can often be set aside and relaid on the street side, with new tile made up on the rear slopes where any difference is out of sight.
Gabled shops on the Upper High Street
Further east the roofs change shape. The appraisal describes the c1900 group at Nos. 11 to 33 Upper High Street, with terracotta details and half-timbered gables, and Nos. 2 to 14, where every two-window bay has its own gable to the street. Gables mean valleys behind them, and on roofs over a century old the valley linings and the battens beside them are often what tips the decision from repair to re-roof.
On these, the work includes new valleys, in lead or a matching tile valley, and careful re-forming of the verge at each gable so the half-timbering below stays dry.

Scaffold and the Surrey highway licence
The pavement in front of the parade is public highway, so a scaffold on it needs a licence from Surrey County Council, the highway authority for Epsom. Applications go in at least 10 working days before the scaffold goes up, and its conditions require a clear walkway past it. That lead time sits at the front of the programme.
Once the scaffold is up:
- only as much is stripped as can be made watertight the same day, so the shop and any flats below stay dry overnight
- junctions with the roofs next door are flashed properly, because these buildings share walls with no gaps
- gutters, fascias and the brick stacks are looked at while access is there, rather than paying for scaffold twice
The length of the job depends on the roof's size, how much timber needs repair and the weather, so a programme for your building comes with the free quote, starting from the licence date. The finished roof carries our 10 year guarantee.
Like for like, and when it stops being like for like
Re-covering a roof in the same material is normally treated as maintenance and does not need planning permission. Changing the covering is different: in the Epsom Town Centre Conservation Area the council expects traditional materials to be kept, and on a listed building, Listed Building Consent is needed for any change that affects its character. If in doubt, check with Epsom and Ewell Borough Council before ordering tiles.
Before any of this, a photo survey of the roof shows whether it really needs replacing or whether a targeted repair will do. If the stacks are part of the problem, see our chimney repairs page. For the full sequence of a re-roof from strip to ridge, there is our guide to replacing a roof.
Frequently asked questions
The brick stacks on our part of the parade are unused. Can they come down during the re-roof?
The appraisal treats the parade's substantial brick stacks as part of its character, so taking one down may need planning permission, and Listed Building Consent if the building is listed. Check with the council first. Keeping the stack and capping it is usually the simpler route.
Next door on the parade has already been re-covered in a different tile. Do we have to match theirs?
Not necessarily. The better match is usually the original clay tile that most of the row still carries. Matching an odd section only spreads the mismatch, so we look at the parade as a whole before choosing a tile.
Who applies for the scaffold licence on the High Street pavement?
The scaffolding contractor normally applies to Surrey County Council, and we co-ordinate the dates with them. The licence runs 28 days at a time, so the programme is planned to keep the scaffold up for as short a time as possible.
Will re-roofing an Upper High Street gable disturb the half-timbering below it?
It should not. The verge at each gable is stripped and re-formed from above, with the timbering protected while the tiles are off, and the new verge set to throw water clear of the gable face.