Detached and hipped: Ewell Court's bigger roofs
Ewell Court has far more detached houses than West Ewell next door. At the 2011 Census, 666 of the ward's homes were detached, about 30% of the total, against about 11% in West Ewell across the Hogsmill. There were 1,200 semis, 127 terraced houses and 225 flats.
That changes what a re-roof looks like. A detached house with a fully hipped roof has slopes on all four sides, four hip lines running up to a short ridge, and eaves right round the building. Compared with a semi under a simple gable, there is more tile to cut at each hip, more hip and ridge to bed or fix, more eaves to finish and more scaffold to wrap the house. A semi still shares its roof with next door, so the new covering has to finish cleanly against the neighbour's tiles along the party wall.
Many of these roofs went on when the old Ewell Court Estate was first built up. Some will have been re-covered since and some may not, so the first job is finding out what is under the tiles you can see.
Knowing it is time, from the back slopes
On a hipped house the front slope is the one you see, and it is often the best preserved. The rear and side slopes take more weather and more shade from the park trees, and that is where tiles start slipping in numbers. We fly the drone round all four slopes and look in the loft, so the decision rests on the whole roof, not the front. Signs that a covering is finished, rather than due a repair, are set out on the main roof replacement page; where only one corner is failing, a roof repair is the cheaper answer.

What sets the price on a four-hip roof
Guide figures for a whole re-roof vary widely with the size of the house and whether scaffold is included, so the useful thing is knowing what moves your own price. On houses here it is mostly:
- The hips. Every hip means tiles cut along both sides and a run of hip tiles bedded or dry-fixed. Four hips on a detached house add up.
- The scaffold. A detached house needs it on every side, and a garage or extension alongside may need it stepped over a lower roof.
- The timbers. Once the old tiles, battens and felt are off, the rafters and wall plates are checked. If we find rot, we stop and show you before going on.
- The stacks and abutments. Each stack needs new lead, and each wall the roof meets needs flashing.
- The tile you choose, and whether the roof has to be brought up to current insulation and ventilation standards under Building Regulations.
Ewell Court is not in a conservation area, so on an ordinary house a like-for-like re-roof is treated as maintenance and needs no planning application. The Planning Portal explains when the Building Regulations side applies. With the scaffold up, it is also the cheapest time to renew the boards along the eaves, covered on our fascias and soffits in Ewell Court page.
Frequently asked questions
Our detached house on Ewell Court Avenue has two chimney stacks. What happens to them during the re-roof?
They stay, unless you decide otherwise. The scaffold gives safe access to both, and the new lead flashing has to be fitted to sound brickwork, so any repointing or rebuilding of the tops is done before the new tiles go on round them. That avoids disturbing the new roof later.
The front of our hipped house near Ewell Court Park looks fine. Why would the whole roof need doing?
It may not. The rear and side slopes often fail first on houses near the trees, because they stay damp and shaded. If the photos show only those slopes have gone, it can be possible to re-cover them and keep the front, as long as the new and old tiles can be matched and joined at the hips.
We have a garage with a flat roof beside the house on Lakehurst Road. Does it complicate the scaffold?
A little. The scaffold has to stand on or step over the garage roof, so we check that roof is strong enough to work from or bridge it. If the garage roof is near the end of its life anyway, replacing it while the scaffold is there saves a separate visit.






