Concrete tiles on the parades
Lambeth's character statement for the Abbeville Road Conservation Area is direct about one thing. Many of the parade buildings still have their original slate or clay tile roofs, or matching replacements, but where concrete tiles have been put on instead, they add a bulky and uneven profile and detract from the original look of the buildings.
That matters when a parade roof reaches the end of its life. The parades went up in the early 1890s on the west side and in 1894 and 1895 on the east, three storeys of yellow stock brick with flats over the shops. Because the conservation area covers them, a change of roof covering that alters their appearance is something to discuss with Lambeth's planning team before you order materials. Re-covering in natural slate, or in clay where the roof was clay, is the straightforward route. Where the rest of the parade has weathered slate, a reclaimed slate can blend in better than a new one.
If your building is one of those that already went over to concrete, a replacement is the chance to put that right.
Re-roofing an 1880s terrace on the side streets
Hambalt Road, Narbonne Avenue and Shandon Road were laid out and lined with terraces in the 1880s. They sit outside the Abbeville Road Conservation Area, which is drawn tightly around the shops, so the choice of covering on those houses is usually yours. The question is what lasts and what looks right next door.
On a roof of that age, the slates themselves may still be sound, but the nails, battens and any old felt have usually given out. The signs that patching has stopped being worth it come together: slates slipping on several slopes rather than one, repeated repairs in the same area, daylight in the loft, and battens that crumble when a slate is lifted.
On a terrace, the attached houses either side matter too. A new roof in a very different material can look odd in a row of slate, and the junction at each party wall has to be detailed properly whichever covering you choose.

One roof, several owners
On the parades, a shop and two floors of flats sit under one roof. On the side streets, a terrace that has been split into an upper and lower flat is in the same position. In both cases the roof usually belongs to the freeholder, or to all the leaseholders together, and the cost is shared under the lease.
That makes a re-roof slower to agree than to build. What helps is evidence everyone can see. We photograph the whole roof by drone, show the faults slope by slope, and put the scope and price in writing, so the freeholder, a managing agent and each leaseholder are looking at the same thing. A drone roof inspection on its own is a sensible first step if the owners have not yet agreed that a replacement is needed.
Scaffold, strip and re-cover
On a mid-terrace house with no side passage, scaffold goes up from the front and often over the back addition, and on a parade it has to be planned around the shopfront and the pavement. We look at the roof, the timbers visible from the loft and the access before we price.
The old covering, battens and felt are stripped back to the rafters, damaged timbers are repaired, and the roof goes back on with a breathable membrane, new battens set to the gauge of the slate or tile, and the new covering laid from the eaves up. With the scaffold in place, it is the right moment to look at the chimney stacks, gutters and fascias too.
Checkatrade's roof replacement cost guide gives a UK average of around £8,000, with most jobs between £4,000 and £19,000, and natural slate on a three-storey building will sit towards the top. Our main roof replacement page explains each stage, and our article on how long a new roof lasts compares coverings.
Frequently asked questions
Our parade building on Abbeville Road has a shop and two flats. Who commissions the re-roof?
Usually the freeholder, or the leaseholders acting together if they own the freehold. Your lease sets out who arranges roof work and how the cost is split. We can quote to whoever holds that responsibility and send the same photos to everyone.
One of the Abbeville Road terraces has steeper roofs than its neighbours. Does that change the job?
A steeper slope needs more care with edge protection and with how slates are fixed, and it can take longer to cover. It also sheds water faster, which is good for the life of the new roof.
What happens to the chimney stacks when a Hambalt Road terrace is re-roofed?
They stay, unless you decide otherwise. With the scaffold up we can repoint the stack, renew the flaunching and fit new lead flashing as the new covering goes on around it, which is the cheapest time to do that work.