Upstairs on the London Road parades
A ceiling stain on the top floor of a parade building is the usual first sign. Sutton Council's draft character study describes the district centre as a mix of three-storey Art Deco parades, two-storey Tudorbethan parades and big box retail, and Sutton's 2022 health check says much of North Cheam's office space is upstairs, above the shops. Many of those upper floors sit under a flat roof hidden behind a parapet, drained through outlets or box gutters at the back or in the corners.
The weak points on a parade roof of this age are:
- Outlets and box gutters. When silt and moss block them, there is no edge for the water to spill over. It ponds behind the parapet and finds its way in at the upstands or round the outlet itself.
- The upstand against the parapet wall. Flashing cracks or pulls away, and water runs down inside the wall.
- Coping joints. Open joints in the coping let rain into the top of the parapet, which then shows as damp below. Loose coping over the pavement is also a hazard to people walking underneath.
- Patch on patch. Years of separate repairs by different owners leave seams that fail one after another.
On a shared roof, the leak that shows in one unit can start somewhere else entirely. A drone lets us photograph the whole surface, the outlets and the back of the parapet without scaffolding or a ladder on the footway, and the photos give the freeholder, the managing agent and the leaseholders the same picture. Where an outlet is simply blocked, clearing it and the pipe below may be all that is needed, and we check the roof around it still falls towards the outlet.
Extensions and garages behind the semis
Behind the half-timbered fronts, many interwar houses here have gained a single-storey kitchen extension, a rear dormer or a garage over the decades, almost all with flat roofs. Some still carry old built-up felt, others have been redone in GRP or EPDM. The common faults are:
- Splits and blisters in old felt that has been baked by years of sun
- Water still sitting days after rain, where the deck has dipped or the fall was never enough
- Leaks at the upstand where the roof meets the back wall of the house
- Leaks around rooflights
- Decking that feels soft underfoot
On a dormer, the covering itself is only half the story. The lead where the dormer meets the main tiled roof is often where the water gets in, and it gets checked on every visit.

Patch, overlay or strip: a London Road parade versus a garage
A roof that is sound apart from one damaged area can usually be repaired. One with blisters across it, leaks in several places or a soft deck is better stripped and re-covered, because patches tend to move a leak rather than stop it. On a parade roof with many outlets, upstands and a parapet on several sides, the detailing matters more than the material, and GRP, with its formed trims and hard-wearing finish, suits that kind of roof. On a plain garage behind a semi, EPDM's single sheet with very few joints is hard to beat, and modern torch-on felt remains the budget choice that still lasts well when laid properly.
Checkatrade's flat roof guide gives £80 to £100 per m² plus VAT for a new EPDM roof, a useful starting point before your own roof is measured.
If water is coming through right now, go to our emergency roof repair in North Cheam. Blocked gutters on the houses behind are covered on our blocked gutter repair page, and a roof inspection is a good first step where nobody has seen the roof for years.
Frequently asked questions
The roof over our London Road shop leaks into the unit above, and the upstairs owner says it is not their roof. What happens next?
It depends on the leases, but parade roofs are often the freeholder's responsibility, recharged through a service charge. We can quote to whoever holds it and provide photos that everyone can see before money is spent.
Water pools behind the parapet of our North Cheam parade after every storm. Is that the outlet?
Very often, yes, either the outlet itself or the pipe below it. If the water clears once the outlet is cleared, that was the cause. If it still sits, the roof has lost its fall in that area and needs relaying.
My kitchen extension behind a 1930s North Cheam semi still has its old felt. Can GRP go straight over it?
Not over old felt. The felt is stripped, the deck is checked and replaced where soft, and the GRP is laid on a sound new board with proper trims and an upstand at the wall.