A whole new roof, or a new piece of one
A search for a new roof in Hook usually means the roof over the house itself: an old covering that has reached the end of its life and needs stripping off and replacing. If that is you, our page on replacing a worn-out roof in Hook goes through it, from what comes off to what goes back on.
This page covers the other half of the work: a roof that does not exist yet. That can be a new pitched roof over a rear extension, a dormer on a loft room, a hip turned into a gable, a lean-to over a side passage, or a new roof on a garage at the end of the garden. In each case the timbers, membrane, battens and tiles go on from scratch, and the new roof has to meet the old one without a leak or a visible join.
Bungalows on the Elmcroft Close curve
Elmcroft Close, off Elmcroft Drive, is a close of bungalows on a tight curve. Kingston's character study for Hook notes that two-storey houses would have felt oppressive on a radius that small, and that the bungalows keep the roofscape distinctive, ordered and coherent. There are more bungalows among the semis and short terraces around Orchard Road.
A bungalow has a large roof for the size of the house, and many bungalow lofts have enough height to make a room, which is why a dormer or a pair of rooflights is a common plan. It is also why new roofwork on a bungalow is so visible. On a two-storey house a dormer sits high and half out of view. On a bungalow it is close to the pavement, next to neighbours whose roofs still match each other.
The same goes for a full new covering. A bungalow roof re-covered in a tile of the wrong size or colour stands out on a close where every roof was built alike, so the tile is chosen before anything else is ordered.

What permitted development does not cover
Hook has none of Kingston's conservation areas, and the borough's Article 4 directions do not restrict householder roof work here. Some rear dormers and loft extensions can therefore go ahead under permitted development, within the limits on volume, height and materials set out in the Planning Portal's loft conversion guidance.
Permitted development does not cover dormers on the front slope facing the road, so a front dormer on the close would need planning permission. A rear dormer on a bungalow is usually the simpler route. Your architect or Kingston's planning team can confirm what applies to your drawings before anything is ordered.
Re-covering an existing roof in a similar material is a different matter: like-for-like re-roofing is normally treated as maintenance and needs no planning permission.
Matching an interwar tile
On a pitched addition, the tile has to match the existing roof in size, colour and profile. Plain clay tiles on an interwar roof need a plain tile beside them, because a large concrete interlocking tile will not lie in the same courses. Where the original tile is no longer made, reclaimed tiles from the same family are sometimes the closest match, and we will tell you plainly if a match is not realistic.
Ridge height and eaves line matter just as much. A dormer set well down from the ridge and back from the eaves keeps the shape of the original roof readable. Where the new roof meets a wall or the old slope, lead soakers and flashings are dressed into the brickwork, and that junction gets the most time on the job. The main roof installation page sets out the build order, and if a flat-topped dormer or extension is on the cards instead, see flat roofs in Hook.
Frequently asked questions
The roof on my Elmcroft Close bungalow is worn out. Is that a roof installation or a replacement?
If the existing roof is coming off and a new covering is going on the same shape, that is a replacement, and the roof replacement page linked above is the one to read. If the shape is changing, for example with a new dormer or a raised gable, it is new roofwork, and we price the two together where both are happening at once.
Is my Elmcroft Close bungalow strong enough to take a dormer?
That is a question for the structural design, not the roofer alone. Most bungalow loft rooms need new floor joists and often a steel, and an engineer or architect specifies those. Once the structure is set, we build the dormer roof and cheeks and weather them to the old slope.
Can you put a tiled lean-to over the side passage of my Orchard Road semi?
Yes, as long as there is enough height on the wall for the pitch the tile needs. Plain tiles need a steeper pitch than most interlocking tiles, so the tile choice and the height available have to be worked out together before the frame goes up.