Terraces that now drain three roofs
On the streets behind Tooting High Street and Mitcham Road, the gutters were sized for a Victorian house with a main roof and a small back addition. Since then many of those houses have been split into flats and extended at the back, and the downpipe at the rear often takes the main roof, the back addition and a newer extension as well. If the pipe is undersized for the roof area it now serves, the gutter overflows at the outlet in heavy rain however clean it is.
A new installation is the time to fix that. We look at how much roof drains to each outlet, then fit a larger pipe or an extra outlet where the numbers say so, and set the fall so each run takes its water to the outlet meant for it. Where the run meets a neighbour's gutter at the party wall, we finish it with a stop end or a proper joint; if you are trying to join an old cast iron run to plastic rather than replace it, that is a repair job, and our gutter repair page for Tooting Broadway covers it.
Materials and guide prices
uPVC is the usual choice on a plain terrace: it is light, cheap and comes in several profiles to match what is already on the row. Cast iron suits a house or parade where the original pattern matters, such as a locally listed front, and lasts far longer if it is painted. Aluminium sits between the two on cost and is the material we use for one-piece seamless runs.
MyJobQuote's guttering guide gives published supply-and-fit figures of £40 to £50 a metre for uPVC, £50 to £75 for cast iron and £55 to £78 for aluminium, before any scaffold or tower. On a two-storey terrace a front and back run can often be reached from ladders; a parade rear three or four storeys up will add access costs. Our main gutter installation page compares the materials on lifespan.

Rear pipes on the parades
Behind the shops on Tooting High Street and Mitcham Road, a single downpipe often runs from the main roof three or four storeys up, past the flat windows, down to a rear yard or onto a stockroom roof. Over the years these pipes get extended, rerouted round extract ducts and joined in places they were never designed for. New pipework at this height is planned with the access in mind, and we try to give each roof its own route to the drain rather than discharging one roof onto another.
If the boards behind the gutter have gone soft, they need replacing before new brackets go on; see fascias and soffits round the Broadway.
The flint houses on Mellison Road
A short walk from the Broadway, the five double-fronted houses of Mellison Road are faced in knapped flint with stone dressings, in a small conservation area. New downpipes on a flint front need more planning than on brick: clips go into the mortar joints rather than the stones, the route keeps clear of the quoins and lintels, and old fixings are taken out carefully so they do not pull flint with them.
Frequently asked questions
Can new downpipes go on the flint front of a Mellison Road house without damaging it?
Yes, with care. Clips go into the mortar joints, the route keeps clear of the stone dressings, and old fixings are taken out gently. Where the existing route works, we reuse it.
Roughly what does new guttering cost on a terrace west of Tooting High Street?
It depends on the length of run front and back, the material and whether a tower is needed for the back addition. The published guide figures above are a fair starting point for uPVC; we measure and give you a written price before any work.
Does new guttering on a parade rear above a Mitcham Road shop need scaffold?
Not always. Some rear runs can be reached from a lower roof or a tower in the yard. Where the full height needs a scaffold, it makes sense to do the gutters at the same time as any roof or window work so the access is paid for once.