Back gardens behind the High Street terraces
Walk along the backs of the streets behind Tooting High Street and Mitcham Road and you can see how the houses are changing: a single-storey kitchen extension on one, a full-width rear addition on the next, a loft dormer on the one after. These are tight rows of two and three storey Victorian houses, and the council notes that many have been converted to flats and that their back gardens are being lost to extensions and conversions.
Each of those changes needs a new roof, and on a terrace that roof has to work with the house it is joined to and the houses either side. It meets the back wall of the main house, the party wall, and often an older back addition with its own slope and gutter. Those junctions decide whether the new roof stays dry, so we spend more time on them than on the open area of the roof.
If what you need is a new covering on the existing roof of your house, because the old slates or tiles have worn out, that is a re-roof rather than a new build, and our roof replacement page for Tooting Broadway covers it, including the scaffold these mid-terraces need.
When one house becomes two flats
A conversion usually changes the roof in one of three ways. The upper flat gains space in the loft, which normally means a rear dormer. The lower flat gains a kitchen or living room at the back, which means a single-storey extension roof. Or both happen at once. We build:
- Rear dormer roofs, flat or pitched, with the cheeks and leadwork weathered into the main slope.
- Flat roofs on rear and side-return extensions in GRP fibreglass or EPDM rubber, with rooflights where the design calls for them.
- Lean-to pitched roofs where the extension is designed with a slope, covered to match the main roof as closely as we can source.
Planning is where a converted house differs from a family house next door. The Planning Portal explains that permitted development rights for loft conversions apply to houses, not to buildings that contain flats. So once a terrace off the High Street has been split, a new dormer on it normally needs a planning application to Wandsworth, even where the same dormer on an unconverted house might not. Your designer deals with that before we price the roof.
The upper and lower flats often end up sharing a downpipe or a drain. When the new roof goes on, we look at where its water will go and whether the existing pipe can take it, which is far easier to fix while the roof is open than after the flats are sold. For the flat roof side in more depth, see our flat roofing work round the Broadway, and our main roof installation page sets out the stages of a new roof.

Getting materials onto a mid-terrace plot
The thing that shapes every roof job on these streets is the lack of a way round the back. Most mid-terrace houses here have no side passage, so timber, membranes, slate or tile and waste all go through the house or up and over the roof. On a conversion that is usually a building site already, which helps. On an occupied house we plan the route with you before the start date and protect the floors on the way through.
Parking near the Broadway is tight and the main roads carry heavy traffic. If a skip or materials have to sit on the street, that needs a council licence, and we arrange the timing so deliveries come in quieter hours where we can.
Where the new roof is built against a wall you share with next door, the flashing has to be let into their brickwork, so it is worth speaking to them early, alongside any party wall notice your designer serves.
Frequently asked questions
We are converting a terrace off Mitcham Road into two flats. What happens to the roof?
That depends on the drawings. Often the upper flat gets a rear dormer and the lower flat a rear extension, so there are two new roofs to build and tie into the old one. We price both together so the junction between them is designed once.
Our top-floor flat off Tooting High Street wants a rear dormer. Is that permitted development?
Usually not. Permitted development for loft conversions covers houses, and a house already split into flats has lost it, so the dormer normally needs planning permission from Wandsworth. Check with the council or your designer first.
How do you build over the back addition on a mid-terrace house with no side access?
Materials come through the house or are lifted over the roof, and old covering goes out the same way. We agree the route and the protection with you before we start, not on the morning.
Our converted house west of Tooting High Street has one downpipe for the main roof. Can it take the new extension roof too?
Not always, especially where one pipe already serves two flats. We check the pipe size against the extra roof area and add an outlet or a separate downpipe if needed. Ask us to look at your plans.






