New roof, or a replacement roof?
If your house already has a roof that is worn out and you want a new one on it, that is a re-roof, and our roof replacement page for Merton Abbey covers it, including matching the pantiles on the rest of your block. This page is about roofs built where there was not one before: a porch, a dormer, a rear extension, or a whole roof on a new building.
In the closes off Liberty Avenue and Brangwyn Crescent, that mostly means small additions to 1980s and 1990s houses with red or brown pantile roofs. They are modest jobs, but the setting makes them more visible than the same job on an older street.
Porches in a close built as a set
These houses were designed in blocks, with the same brick, the same pantiles and dual or mono pitched canopy porches repeated along the row. Merton's Church Road character study lists porch additions breaking the architectural rhythm on some terraces as one of the area's problems. On streets that have been altered piecemeal, one more porch goes unnoticed. In a close designed as a set, it does not.
For a porch, getting it right usually means copying the pitch, depth and form of the original canopies in your close, tiling it in a pantile close to the main roof, and dressing a lead flashing into the brickwork above. A flat-topped porch is cheaper, but on a row of pitched canopies it is the one that looks added on.

Dormers on the three-storey houses
Some houses in the closes already have dormers, and a dormer is the usual way to get more usable room out of a top floor. The roof of the dormer is only part of the job. It needs a covering laid to a fall that drains into a gutter rather than onto the slope below, cheeks clad and weathered against wind-driven rain, and lead where the dormer meets the pantiles.
Pantiles are single-lap tiles with a deep roll, so the lead at the dormer has to be dressed closely over the tile profile, and the cut tiles beside it fixed so they cannot slip. That junction is where a dormer on a house like this is most likely to leak in later years, so it gets the most time. On a three-storey house the work is done from a scaffold, and on a staggered block the scaffold often has to step round the house next door. If the dormer is to have a flat top, our page on flat roofing in Merton Abbey compares the coverings.
Back extensions in short gardens
Rear extensions on houses like these are usually single storey. The choice is usually between a flat roof in GRP or EPDM, with or without a rooflight, and a lean-to pitched roof tiled to match the house. A lean-to needs enough height under the first-floor windows to give a workable pitch for pantiles, and on some of the two-storey houses there is not much room. The flat or pitched roof trade-offs are much the same here as anywhere.
Whichever you choose, the joint with the existing back wall decides how the roof performs: the upstand on a flat roof, or the lead flashing on a lean-to. The new roof also needs somewhere to send its water, so the existing gutter and the boards behind it are checked before work starts.
Whether a porch, dormer or extension needs planning permission depends on its size and position, and on whether permitted development rights were limited when the estate was built. Check with Merton's planning team or the Planning Portal before committing. Our main roof installation page lists the kinds of new roof we build.
Frequently asked questions
Will a new porch canopy look out of place in my close off Liberty Avenue?
Not if it follows the porches already in the close. Copy the pitch, the depth and the tile of the original canopies on your block, and the new one reads as part of the set.
The whole roof on my house in Sutherland Drive is worn out. Is that roof installation?
No, that is a roof replacement: the old pantiles, battens and underlay come off and the roof is re-covered on the existing structure. Roof installation is for new roofs on additions such as porches, dormers and extensions.
Can an extension roof on a staggered block in Landseer Close drain into the main gutter?
Sometimes. It depends on whether the existing gutter and downpipe can take the extra water and where the nearest drain is. Where they cannot, the extension gets its own gutter and downpipe, and that is settled before the roof goes on.