What Moat's re-cladding changed behind the downpipe
Drill into the front of a house in one of the estate's closes and the first few centimetres are soft. When Merton approved Moat's £35m scheme for the Pollards Hill estate in September 2016, the council's announcement said more than 400 existing homes would be altered, with improved roof insulation and external wall insulation among the works. The result is a layer of insulation boards fixed to the outside of the old walls and finished in render.
That keeps the houses warmer, but it changes what is behind any downpipe clip or bracket. The original wall is now some distance behind a soft layer and a thin render skin. A standard screw driven into that will not hold a downpipe in a gale, and a badly made hole lets water into the insulation, where it can stain the render or loosen it.
Before we drill, we find out how thick the insulation is. Clips and brackets then go on with fixings suited to that build-up, so the load reaches something solid without crushing the insulation, and each hole is sealed so rain cannot track in.
Long downpipe runs in the county-named closes
The estate's houses are three storeys high with flat roofs, so on many of them rainwater runs from a roof outlet into a hopper or straight into a long downpipe down the face of the building. On a run that tall, the spacing of the clips and the joints between lengths matter more than usual. A pipe that drops a joint near the top will soak a long strip of new render before anyone notices.
If you rent from Moat, rainwater goods are likely to be Moat's to maintain. Freeholders on the estate are responsible for their own.

Semis off Chestnut Grove and Sherwood Park Road
Off the estate, the interwar semis are a different shape. Where the roof is hipped, it drains on three sides, front, back and the outer side, so the gutter wraps round two outer corners, often with a small bay gutter below at the front. Each corner is a joint, and on a pair of semis the run also meets next door's at the party line.
For most of these houses a uPVC system in a half-round or deeper profile does the job at a sensible cost, while aluminium lasts longer and comes in coated colours. Where the eaves are long and straight, seamless gutters in Pollards Hill take the joints out of each run. We set every run to a fall towards its outlet and connect the downpipes to the drain, gully or water butt.
Timber fascias on houses of this age are often soft behind the old gutter, and new brackets on rotten wood just move the problem, so we check them first. If the boards need replacing, our fascias and soffits service can do them on the same visit. The main gutter installation page compares materials in more detail.
Frequently asked questions
Can new downpipes be fixed to the insulated render on my house in Radnor Close?
Yes, with fixings made for insulated walls rather than plain plugs and screws. We check the depth of insulation first and seal each fixing so water cannot get behind the render.
My hipped semi on Chestnut Grove has gutters on three sides. Do they all need replacing?
Not always. If one side has failed and the rest is sound, we can replace that run and join it properly at the corners. If all of it is the same age and brittle, replacing the whole house in one go usually costs less than doing it in stages.
My new gutter on a Wide Way semi will meet next door's old one. How is that joined?
Where the profiles match, a union joins the two runs at the party line. Where they differ, we use an adaptor, or finish our run with a stop end and its own outlet so neither house sends water into the other's gutter.