Manor Fields to Wildcroft Manor, built 1932 to 1936
In the space of four years, three large houses on the edge of Putney Heath were pulled down and replaced by mansion flats. John Laing and Son built Manor Fields on the site of North House in 1932 to 1933. Highlands Heath replaced Highlands on Portsmouth Road in 1936, and Wildcroft Manor replaced Wildcroft the same year. Each estate is four storeys high, and each was built as one development, so the roofs on every block have aged together.
That is why replacement comes up on these estates as a whole-block, or whole-estate, question rather than one slope at a time. When the nails, battens and underlay of a roof were all fixed in the same year, they tend to fail across the roof in the same decade. The signs are familiar: tiles slipping in different places each winter, ridges rebedded more than once, damp spreading across a top-floor ceiling rather than showing at one spot, and the old underlay brittle or torn when the loft is opened up.
The three estates have quite different roofs. Manor Fields has clay-tiled mansards with tall chimney stacks. Wildcroft Manor has heavy mansards with dormer windows and half-timbered gabled bays. Highlands Heath has shallow, squared-off roofs with ridge tiles predominant, on blocks many of which suffered V1 blast damage in the war.
Why a block re-roof starts with Wandsworth's planning team
Wandsworth Council's appraisal and management strategy for Putney Heath is clear on two points that shape every roof replacement on these estates.
First, maisonettes, blocks of flats and houses converted to flats have no permitted development rights in the conservation area, so most external alterations need planning permission, and the strategy names reroofing and altering chimneys in that list. That applies to the three estates, to Ullswater on Putney Hill, and to converted houses such as Lyle Park.
Second, roofs in the conservation area are generally clay tile or slate and should be re-covered in a similar material when renewal is needed. Chimneys should always be kept, and rebuilt if they have become unstable. A cheaper concrete tile on a Manor Fields mansard is very unlikely to be accepted.
In practice, the managing agent or residents' company raises the project with the council before the specification is settled. We can supply drone photos of every slope, a written description of the existing covering and a specification for the new one, so the planning conversation starts from facts.

Mansards at Manor Fields, dormers at Wildcroft, shallow ridges at Highlands Heath
A mansard is two roofs in one: a steep lower slope, almost a wall of tiles, and a shallower upper slope behind it. Replacing one means scaffolding to the full four storeys, stripping the old tiles, battens and underlay, checking and repairing the timbers, then a new breathable membrane, new battens and clay tiles fixed to the correct gauge. The break between the two slopes needs its own detail so water does not get in at the change of angle.
The dormers in the Wildcroft Manor mansards are where most of the time goes. Each dormer has cheeks, a roof and lead at every edge, and on a block with dozens of them the leadwork is a large share of the job. The Highlands Heath roofs are simpler in shape, but long ridges on a shallow pitch need careful bedding.
With the scaffold already up, it is the right time to renew gutters, fascias and soffits too. Our fascias and soffits page for Putney Heath covers the roof edge, and Wildcroft Manor's gables need particular care there.
For scale only, Checkatrade's roof replacement cost guide puts a typical UK house re-roof at around £4,000 to £19,000. A four-storey block of mansion flats is a far larger job and has to be priced from a survey.
Houses here follow the same guidance. On an Edwardian house in Heathview Gardens it means a tile matching the one already there, and on a slate roof such as Bowling Green Cottage's, as many good slates as possible saved for re-use. If the roof is not yet past saving, our roof repair page for Putney Heath may be the better place to start, and the main roof replacement page explains the process step by step.
Frequently asked questions
Our Manor Fields residents' company wants a re-roof costed. What do you need from us?
Access to the roof space where possible, any previous survey reports, and agreement for a drone flight over the blocks. From that we prepare photos, a description of the existing roof and a specification that the agent can use both for planning and for comparing quotes.
Do the Wildcroft Manor dormers have to be rebuilt during a re-roof?
Not always. Sound dormer structures are kept and re-weathered with new lead and tiles. Where the timber in a dormer cheek or roof has rotted, that part is repaired or rebuilt before the new covering goes on.
Does a Highlands Heath roof with mixed tiles from post-war repairs need replacing?
Not on that evidence alone. Mixed tiles show the roof has been repaired, not that it is failing. The question is whether the fixings, battens and underlay across the whole roof are still sound, which a survey answers.






