What the St John's Hill Grove guidance says about dormers
West of the station, the villas and terraces between St John's Hill and Brussels Road sit in a conservation area with its own design guidance. Wandsworth Council says a small lead-clad dormer with a sash window often suits a Victorian house here, while box dormers that cover the whole roof are less attractive and break up the pitched roofscape. On Oberstein Road the mid-Victorian pairs still have the French-style dormers they were built with.
That guidance shapes the roofing as much as the drawings. A small lead dormer is mostly leadwork: lead-clad cheeks and top, soakers and flashings worked into the slate either side, and a neat apron below the window. A wider flat-topped dormer is mostly a flat roof, so the deck, the covering and its edges carry the risk. In both conservation areas around the station, any roof extension on a house needs planning permission, and the Planning Portal's loft conversion guidance sets out the Building Regulations side. Your architect or builder usually handles the applications, and we build to what was approved.
Side returns between the Northcote Road terraces
On the gault-brick terraces of Abyssinia, Cairns, Shelgate, Mallinson, Bennerley and Salcott Roads, the long back additions leave a narrow side return between houses. Filling it in gives a bigger kitchen and a new roof squeezed against the neighbour's wall. The usual choices are a flat roof in GRP or EPDM with a rooflight, or a lean-to in slate that picks up the main roof. On streets that climb the slope, the neighbour's wall is often at a different height to yours, which affects where the new roof can sit and where its flashing goes.
Drainage needs settling early. A roof wedged between two back additions has nowhere obvious to send its rain, so we plan the outlet, gutter and downpipe at the start instead of leaving them to the end. Our flat roofing in Clapham Junction page covers the GRP, EPDM and felt systems for the flat options.

Where the new roof meets the old slate
Victorian slate is laid on battens that may never have had an underlay, and the slates around a new opening are often as old as the house. Cutting in a dormer or tying a lean-to into the wall disturbs them. We set lead soakers and flashings into the slate courses, cut the slate neatly to the new cheeks, and check the slates either side for loose fixings while we are there. Where a dormer meets a party wall or a brick fire wall, the junction with next door needs particular care, and the Party Wall etc. Act 1996 may apply. The government's explanatory booklet sets out when notice is needed.
If the scaffold shows the rest of the slope is near the end of its life, it is cheaper to deal with it at the same time than to bring the scaffold back. Our roof replacement team can re-cover it in the same job, and our main roof installation page explains the rest of the process.
For a flat-topped dormer or side return, MyJobQuote's fibreglass roofing guide puts a fully insulated GRP roof on a 20m² single-storey rear extension at £4,200 to £5,400. Pitched and lead dormers vary too much for a table, so we price yours from the drawings or a site visit.
Frequently asked questions
Oberstein Road houses have French-style dormers. Could a new dormer copy that look?
The design is a matter for your architect and the council, and following an existing local pattern can help an application. Once it is approved, we build the roofing details to match the drawings, including the leadwork and slate around it.
My side return on Mallinson Road sits against next door's wall. Where will the rain go?
Usually to a gutter or outlet along the low edge, then a downpipe into the existing drain at the back. If the wall is shared, the flashing into it and any gutter on the boundary may involve your neighbour, so it is worth talking to them early.
Can a new roof go over the yard behind a shop on St John's Road?
Possibly, but in the Clapham Junction Conservation Area commercial buildings have no householder permitted development rights, and most material alterations need planning permission. Once permission is in place, we can build the roof and plan the access through the building or from the back.