A whole new roof on a Cheam house
Most people searching for a roof installation here want a new roof on the house they already own. Where the old covering is worn out but the shape stays the same, that is a re-roof, and our page on roof replacement in Cheam covers stripping and re-covering. This page is about building roofs: where the structure itself is new or changed, on a rebuilt or remodelled house, a side addition or a loft.
A full installation covers the wall plates, rafters or trusses, membrane, battens, clay plain tiles, hips, valleys, leadwork and the eaves detail. On a house in the Burton style, that means a hipped main roof, often a subsidiary gable, and a full-height bay with its own small hipped roof, all of which have to be weathered properly where they meet.
Clay plain tiles are small and need a steep pitch, so the structure has to suit them from the start. New machine-made clay looks bright at first and tones down over a few years. Handmade or reclaimed tiles get closer to the weathered roofs next door from day one.
What the Burton Estates guidelines expect of a roof
Since 2011 the Burton Estates in South Cheam have been an Area of Special Local Character. That does not remove permitted development rights, but where a scheme needs planning permission, the design guidelines in the Burton Estates character appraisal are the yardstick. The points that shape a new roof:
- The main roof stays hipped. Gable ends to it are strongly discouraged because they close the gap with next door.
- Subsidiary gables to the front or rear are in character.
- Side extensions should have lower roofs and be set back from the front of the house.
- Front dormers at second-floor level will be resisted. Dormers on lower side extensions or catslide roofs are acceptable, as are rear dormers that cannot be seen from the street.
- Tiles should be red clay, existing chimneys should stay, and skylights in the slope are fine.
A small number of houses in Sutton are also covered by an Article 4 direction on roof alterations, so check your address with the council before you plan a dormer or roof extension.

Side additions and garages on a wide plot
On a plot this wide, the usual additions are a lower side extension, a garage brought up to the flank boundary, or a rear dormer on a loft conversion. The roof on each has to meet the old hipped roof without a visible join. We cut the new roof into the existing slope, form the valleys, and dress lead into the brickwork wherever roof meets wall.
Many garages and kitchen extensions here have flat roofs, built as a warm deck finished in GRP, EPDM or felt, and our page on flat roofing in Cheam covers that choice. For a pitched roof on a new addition, MyJobQuote's new roof guide gives a national material cost of £40 to £90 per m² for clay tiles, before labour, structure and scaffold.
Talk to us before the design is fixed. A roof line that looks tidy on a drawing can be awkward to weather where it meets a hip and a projecting gable, and it costs far less to change a line on paper than on site. Our main roof installation page explains the build in more detail.
Frequently asked questions
We are rebuilding a house on Downs Side. Does the new roof have to be clay?
If the rebuild needs planning permission, expect the council to weigh the Burton Estates guidance, which asks for red clay and strongly discourages grey slate and black or green tiles. Clay plain tiles also suit the steep hipped forms the guidance favours.
Can a dormer go on the catslide roof of my Shirley Avenue house?
The guidelines accept dormers on catslide roofs and lower side extensions. We build them with tile-hung or leaded cheeks and a roof that matches the main covering.
Can my flat garage roof on a Sandy Lane corner plot be pitched?
Often, if the walls can take the weight. On a corner plot the appraisal strongly discourages building up over a boundary garage, so a low hipped or lean-to roof is more likely to be accepted than anything taller.
Can solar panels go on the new roof of my Golf Side house?
The appraisal asks for care with panels that can be seen from the street, so a rear or side slope out of view is the easier place for them. The roof structure and battens are planned for the panel fixings before the tiles go on.