Building from the back on Arodene Road and Leander Road
Replacing the worn-out roof on the house itself rather than adding a new one? That job is a roof replacement in Brixton Hill, where the old covering is stripped and renewed. This page is about new roofs: dormers, side returns, rear extensions and garden rooms.
The roads between Helix Gardens and Elm Park went up quickly, between about 1875 and 1895. Lambeth's conservation area appraisal describes them as generally two storey houses with full-height front bays, set back behind very small front gardens, and notes that most of the terraces stand too close to the road for parking forecourts. Leander Road was built between 1876 and 1888, Arodene Road in 1891.
That layout decides how a new roof gets built. A mid-terrace house has no side passage, so the slate, membrane and decking usually come through the hallway or over a neighbour's wall, and the scaffold for a dormer goes up in the back garden. We work this out at the quote stage, because it changes the price and the number of days the job takes more than the roof design does.
Dormers against old slate
A rear loft dormer on one of these terraces usually has a flat top and tile-hung or lead-clad cheeks, set into a slate slope that is well over a century old. The dormer is the easy part. The hard part is the line where new meets old: the lead soakers and flashings down each cheek, the apron along the bottom and the slates cut in around it. If those are rushed, the dormer leaks at the corners within a few winters.
We match the slate size and colour as closely as we can, using reclaimed slate where new slate looks wrong next to the original, and dress the lead so it can move with the seasons. On the flat top, the covering, trims and upstands go on with a proper fall towards a gutter, so water is not left lying against the old roof.

Side returns and garden rooms
Where a house has a narrower back addition with a passage beside it, filling that passage with a side return extension is a common way to widen a kitchen. The new roof has to sit against the party wall on one side and the old back addition on the other. Most are flat roofs in GRP or EPDM, sometimes with rooflights, or a lean-to pitch where the drawings call for one.
For a flat roof the build-up is deck boards, a vapour control layer and insulation for a warm roof, then the waterproof layer, edge trims and upstands flashed into the walls. For a pitched section it is membrane, battens at the right gauge, slate from the eaves up, then the abutment flashings and a gutter. Garden rooms at the end of the long, narrow gardens take a simpler flat roof, but they still need a fall and a gutter so water does not run against a boundary wall. Our flat roofing page for Brixton Hill covers the coverings in more detail.
Planning on a converted house
Much of Brixton Hill is in Lambeth's Rush Common and Brixton Hill conservation area. The Planning Portal's guidance on loft conversions explains that a loft conversion in a conservation area is not permitted development, and that permitted development rights do not apply to buildings containing flats. Building Regulations approval is separate and applies to almost any new roof over living space, and work against a neighbour's wall can bring in the Party Wall etc. Act 1996. Your architect or builder normally handles the paperwork, and we build to the approved drawings. Liam, our Lead Roofer, leads installs with Jed and Gurpret. The main roof installation page explains how each type of roof is put together.
Frequently asked questions
How do materials reach the back of a mid-terrace house on Leander Road?
Usually through the house, with floors and the hallway protected, or over a neighbour's garden if they agree. We plan deliveries in small loads and agree where waste goes before the first day, so the front garden and pavement stay clear.
My Beechdale Road back addition has an old slate lean-to. Can a new side return roof join it?
Yes, but the junction needs care. We check the condition of the old slate and the wall it sits against, then either flash the new roof into it or, if the old lean-to is failing, suggest re-covering both so you are not left with a weak joint between them.
Where does a new side return roof most often leak?
At the edges, not in the middle. The upstand along the party wall and the junction with the old back addition take the most movement, so we spend as much time on those details as on the covering itself.