Dormers that break the line on High View Road
We build new roofs for homeowners across Upper Norwood: dormers, extension roofs, porches and bay roofs. If what you need is the whole roof on your house stripped and renewed, that is a re-roof in Upper Norwood, with its own page.
High View Road is a short street of detached Victorian houses, two storeys high and three bays across, in red brick with slate roofs. Croydon's appraisal of the Harold Road Conservation Area likes it for its spacious feel and the view down to the Recreation Ground. It also points out the problem: dormer windows in various designs, added house by house, that break the uniformity of the roofline.
That is the risk with any new roof on these streets. A dormer or extension roof can be watertight and still look wrong, because its pitch, cladding or size fights the house it sits on. The council's guidance for the area is clear on the main points. Dormers and rooflights should not go on street-facing slopes. Roof extensions visible from the street are generally resisted. Rear extensions may be acceptable if they stay subservient to the main house. A dormer here needs planning permission, so your designer and the council settle the shape, and we build it so the details hold up.
Slate lean-tos on the long Harold Road plots
The villas on Harold Road sit on long, narrow plots, and many back gardens drop away down the slope. A single-storey rear extension is the most common addition, and behind a slate-roofed villa a pitched lean-to in natural slate often looks better than a flat roof, because it reads as part of the house.
Natural slate needs a reasonable pitch to shed water, and the lean-to has to reach it without climbing into the sills of the first-floor windows above, so we check the heights on the drawings before anything is ordered.
Where the lean-to meets the old brick wall, the joint is sealed with lead flashings cut into the mortar joints and dressed down over the slates. A mortar fillet looks tidy for a year and then cracks. On a sloping garden the new gutter can end up at a different level from the drain, so the downpipe route is planned at the start.
Where the extension is wide or the headroom too tight for a pitch, a flat roof may be the only option. The coverings for that are compared under flat roofs in Upper Norwood.

Tying new slate into old
A rear dormer cuts a hole in a roof that may have been untouched since the 1890s. The slates around the opening have to come off, the rafters are trimmed to take the new frame, and the dormer is weathered back in with lead soakers or a lead apron at the front, valleys or flashings at the sides, and slates cut and refixed tight to the cheeks.
Victorian slate is brittle and the nails holding it are often rusty, so stripping back a strip around the opening usually loosens a few more slates than planned. We allow for that, save every sound slate we take off, and use them around the new work so the patch matches the rest of the slope. Where more are needed, we source natural slate in the closest size and colour.
If your existing roof is tired all over, re-covering it while the scaffold is up for the dormer saves putting up a second one.
What a rear dormer costs and how long it takes
A dormer is usually part of a loft conversion, and the roof is only one piece of that bill. As a published national figure, MyJobQuote's dormer loft conversion guide puts a whole dormer conversion at £30,000 to £60,000, taking around six to eight weeks. A villa with a three-storey rear wall needs more scaffold than a typical semi, which pushes that up.
Porches, bays and small roofs
Small roofs are where details tend to get skimped. The houses on Vermont Road have elaborate timber porches, and Essex Grove has decorative timber pitched porches, both picked out in the appraisal as worth keeping. Where a porch roof has rotted, we rebuild it to the same shape, re-cover it in slate or lead to match, and flash it properly into the wall. On bay roofs we do the same with the lead or slate that was there.
The appraisal also says original open porches should not be enclosed, so raise a new porch roof on a period front with the council first. Building Regulations for new roofs are covered on our roof installation service page.
Frequently asked questions
Can a rear dormer on High View Road have slate cheeks instead of tile or render?
Yes, if the design allows it. Slate-hung cheeks with a lead roof sit well behind a slate main roof and are hard-wearing. The planning drawings should show the finish, so it is worth deciding before they are submitted.
Can you rebuild the timber porch roof on my Vermont Road house as it was?
Yes. We copy the pitch and shape, replace rotten timbers, and re-cover and flash it to match. If the decorative carpentry needs a joiner, we tell you before we start.
Will a slate lean-to on my Harold Road villa block the window above it?
It can if the pitch is wrong. We check the sill height of the first-floor window against the pitch slate needs before the design is fixed, and suggest a lower-pitch covering or a flat roof if the numbers do not work.






