Having an emergency? Call us now, 24/7
Hipped tiled roof with roof windows and scaffolding.

Roof Installation in Streatham Common

Around the common, a new roof is either a whole new covering on a century-old house or a roof over a rear addition on Southside's deep plots. Either way, the front slope faces a conservation area.

About 3.5 miles from our Kenley Rd baseSW16Open 24 hours, 7 days
  • 10 Year Guarantee
  • Free Quotes, Often Same Day
  • Family Run for 20+ Years

Get your free quote

Tell us what’s going on and we’ll call you back, usually the same day.

Free, no-obligation. 20% discount for OAPs. We only use your details to reply to you (privacy policy).

A whole new roof on a house facing the common

Most people looking for a new roof here mean the main roof of the house. On the villas of the North Side and Southside that usually means natural slate or clay, because the appraisal behind the Streatham Common Conservation Area names slate and pantiles as the main coverings and treats concrete tiles as a change that has degraded the area. If your existing roof has simply worn out, our page on replacing a roof in Streatham Common covers stripping and re-covering in detail.

A full new roof is a bigger decision than a re-cover. It can mean new rafters where the old ones have sagged, a new layout of valleys where a previous owner made changes, or a different covering on the back slope from the front. On tall Southside houses with turrets and dormers, the cutting and leadwork around each feature is often where most of the time goes.

For a sense of national figures, MyJobQuote's 2026 new roof guide puts natural slate at £95 to £275 per square metre and clay tiles at £40 to £90, supply and fit, before scaffolding, and a decorated roof here would sit towards the top of that range.

Room at the back on Southside's deep plots

Above its oldest houses near the High Road, Southside is largely Edwardian and interwar, built on wider and deeper plots. Those gardens are where most new roofs on additions end up: over a kitchen or garden room added to the back, over a rear dormer, or on a workshop at the end of the garden.

Some houses were built with more than one roof from the start. The 1931 pair at nos. 30 and 31 Southside, described in the appraisal as broad and double fronted, has integral garages. Where a garage like that is being converted or extended, its roof often has to be rebuilt or raised to suit the new use.

Rear elevations vary a lot. Some of the bigger Southside houses have tall returns that take up half the back wall, and others have no return at all. A flat-backed house gives a clean wall to build against, while a return means the new roof meets two old walls and probably a valley.

Brick gable end with neat orange clay tiles along the verge and white bargeboards
Neat verges and bargeboards are the finishing touch on a newly tiled roof. Photo: Jan van der Wolf on Pexels

Dormers and front slopes: what the appraisal criticises

The appraisal does not object to dormers as such. It says dormers and roof lights are common throughout the conservation area and vary in quality. Where it is critical, it is specific: it notes that large modern dormers on one interwar pair on the North Side compete with the original roofs, and calls one front dormer obtrusive. More generally it says modern roof lights and extensions on visible slopes have harmed the area.

So for a house facing the common, the realistic place for a new dormer is the back. On the Streatham Lodge Estate to the south, an Article 4 Direction also covers front roof slopes on the houses in its schedule, and our Streatham Common area page explains which. Design and planning are for you and your architect to settle with Lambeth. We build what has been approved, and if a detail on the drawings looks likely to cause trouble with water, we say so before we start.

Low pitches, soft pointing and the join

A rear addition often cannot take a steep roof without blocking a window above. Below about 20 degrees, natural slate is not suitable. The options then are low-pitch tiles made for shallow slopes, a metal roof, or a flat roof, which our flat roofs around the common page covers.

Where the new roof meets the old house is where the care goes. The appraisal describes pointing here as traditionally understated and recessed from the brick face. The chase for the lead flashing has to be cut along a mortar joint without chipping the brick arrises, and once the lead is dressed in, the joint is repointed to match the soft, recessed finish around it rather than in hard cement. The new roof also has to drain without pushing water into the valley of an existing return, so we work out the gutters and downpipes for the addition at the same time. The main roof installation page runs through each stage.

Frequently asked questions

Can you build a new roof over an integral garage like those at nos. 30 and 31 Southside?

Yes, once the design has been approved. A garage being turned into a room usually needs a roof that is insulated and ventilated properly, and on a front-facing garage the covering should sit with the main house.

I want a roof on a workshop at the end of my Southside garden. Does it need planning?

Outbuildings in a conservation area have tighter permitted development limits than elsewhere, so check with Lambeth before you commit. Once the size and position are settled, we can build the roof in a covering that suits the garden and the house.

Does the turret on my Southside house make a new roof much harder?

It adds time rather than difficulty. A turret is a small, steep cone or pyramid with a lot of cut slates and lead at its base, so it is set out separately from the main slopes. We look at it by drone first, so the quote covers the access and materials it needs.

Recent work from our crews

See more of our work

Dark flat roof surface around a rooflight.
Black gutter and corner joint beside a tiled roof edge.
Hipped tiled roof with roof windows and scaffolding.
Tiled pitched roof with roof windows and a dormer above a house.
Newly installed flat roof felt system on a residential property overlooking surrounding homes.
Commercial roofing job in Wimbledon, with a ladder up to the roof edge of a drive-thru unit.

Roof Installation near Streatham Common

Streatham Common is about 3.5 miles from our Kenley Rd base in Morden. See every area we cover.

Roof Installation in nearby areas (miles from Streatham Common)

Not sure we cover your street? Call 0330 133 4111 with your postcode.

Precise Roofing & Guttering LTDKenley Rd, Morden SW19 3JJ

Open in Google Maps Get directions

Roof Installation in Streatham Common

Free quotes in Streatham Common, often the same day you call.